J.P. Morgan Making Sense · · 11 min
How generational demand is transforming the power grid
With Arshad Mansoor
ChorusBring the market's conversation to your AI. Learn more
Summary
In this J.P. Morgan Making Sense episode, Arshad Mansoor (EPRI) argues that after roughly fifteen years of flat electricity use, New York demand is set to rise about 25% over the next fifteen years, making grid speed and reliability the enablers of growth. He frames the main constraints as a mismatch between the roughly eighteen-month clock for a hyperscaler such as Google to build a 100-megawatt data center and the five-to-fifteen-year timelines for transmission, with skilled labor, parts and permitting as the three Ps to fix. He cites Germany's LNG terminal, permitted in nine months under energy-security urgency, as proof permitting can move fast when there is will. He also points to utilities' spare capacity outside peak hours, large tech customers funding grid buildout directly, and EPRI's work with NYPA on AP1000 nuclear plants, while noting that grid batteries last only about thirty minutes and cannot replace natural gas.
Key takeaways
- Arshad Mansoor on Power demand & the grid: New York electricity demand, flat for fifteen years, is set to rise about 25% over the next fifteen.
- Arshad Mansoor on AI infrastructure & data centers: Data centers can be ready in eighteen months while grid transmission takes far longer, creating a clock mismatch.
- Arshad Mansoor on Power demand & the grid: Public trust that bills won't rise is the slowest-moving constraint on grid growth and must be addressed.
- Arshad Mansoor on Power demand & the grid: Transmission lines can be permitted and built in five to seven years if permitting is done right.
- Arshad Mansoor on Power demand & the grid: Skilled labor is the top grid buildout constraint, followed by supply chain parts and then permits.
What was said, by company and theme
11 views from 1 speaker. Every quote is checked against the episode's transcript (how).
Power demand & the grid
Where everyone stands on Power demand & the grid
Arshad Mansoor · Electric Power Research Institute (EPRI)
New York electricity demand, flat for fifteen years, is set to rise about 25% over the next fifteen.
After roughly fifteen years of flat to slightly declining electricity use in New York (2010 to 2026), Mansoor expects consumption to rise about 25% over the next fifteen years. He uses this to argue that the utility industry, which is 120 to 140 years old, now sees grid speed and reliability as the enabler of growth and prosperity.
“the amount of electricity that you use in New York is actually flat to slightly ... gone down. In the next fifteen years, 25% up.”at 3:19
Arshad Mansoor · Electric Power Research Institute (EPRI)
Hyperscalers like Google and Microsoft are directly financing grid infrastructure, not only via ratepayer bills.
Mansoor describes a new way of financing grid buildout in which the infrastructure is paid for directly by large technology customers such as Google and Microsoft, and possibly Micron, rather than only by monthly electricity bills. He calls it a brand-new approach that is helping to meet demand.
“it's being financed directly by Google, by Microsoft and maybe Micron will come in... So that's a brand new way of we are seeing which is helping.”at 4:25
Arshad Mansoor · Electric Power Research Institute (EPRI)
Public trust that bills won't rise is the slowest-moving constraint on grid growth and must be addressed.
Mansoor says the first constraint is keeping the lights on and keeping bills from rising, which must be met before deciding how to meet demand. He calls the 'speed to trust' clock the one running slow: customers need confidence that bills won't rise and that reliability will hold. He says this needs addressing in the near term if electricity is to drive growth again.
“The speed to trust of people that my bill will not go up, that the infrastructure will remain reliable... and my bill will not go up. I think that needs to be addressed in the near term”at 5:26
Arshad Mansoor · Electric Power Research Institute (EPRI)
Transmission lines can be permitted and built in five to seven years if permitting is done right.
Mansoor says permitting time depends on the location, but a transmission line can be permitted and built in five to seven years if things are done right. He says permitting could be faster if the process is streamlined further. He also cites areas where timelines that once took ten to fifteen years are now moving more quickly.
“Depends where you are, but if things are done right, I think we can get permitted built five years, seven years. It could be done quicker if the permitting process is even more shrinked.”at 7:10
Arshad Mansoor · Electric Power Research Institute (EPRI)
Skilled labor is the top grid buildout constraint, followed by supply chain parts and then permits.
Mansoor says the number one constraint will be people, meaning skilled labor, because electricians will be drawn to data center and factory builds as well as transmission lines. Parts and the supply chain are the second constraint and will be huge, and permitting is third. He calls these the three Ps (people, parts, permit) that must be fixed.
“I think the number one constraint is gonna be people... parts are the number two, supply chain is going to be huge, and then permit. So I call it people, parts, permit.”at 7:31
Arshad Mansoor · Electric Power Research Institute (EPRI)
Batteries and flexible data-center load let existing grid capacity absorb growth while new lines get built.
Mansoor notes that utilities keep grid capacity for the hottest day, so spare capacity exists most of the time. He says batteries and flexible load are being used more on hot days, and that Google and Microsoft are working with EPRI on ways to back off the grid. He argues that growth can use this existing infrastructure while new infrastructure is built.
“On the hottest day let's use the batteries to supply. That is happening now at a much faster pace because when growth comes in you already have an existing infrastructure, can I use that more to feel that growth while I'm building new?”at 8:43
AI infrastructure & data centers
Where everyone stands on AI infrastructure & data centers
Arshad Mansoor · Electric Power Research Institute (EPRI)
Data centers can be ready in eighteen months while grid transmission takes far longer, creating a clock mismatch.
Mansoor says a hyperscaler like Google can get a 100-megawatt data center ready in about eighteen months, which is its clock. Getting transmission and power ready for the same load used to take ten to fifteen years. Where permitting is quick, that is starting to shrink, so the two clocks now run at different speeds. This mismatch is the core of the speed-to-power problem.
“[If I am Google] I can get compute 100 megawatt ready in a data center in eighteen months. That's their speed, that's their clock. You want transmission and power and everything ready for that, that clock five years ago would take ten to fifteen years.”at 4:56
Arshad Mansoor · Electric Power Research Institute (EPRI)
AI and electricity are two sides of one coin; the grid is now the top bottleneck and enabler for AI.
Mansoor argues that energy and electricity have become inseparable from data centers and AI, so a CEO has to plan for power at the same time as chips and factory sites. He says the grid has become the number one bottleneck but also the number one enabler for what companies are trying to do.
“energy, electricity, and if you call data center or AI, they are two sides of the same coin... The grid is becoming number one bottleneck but number one enabler for what you're trying to do.”at 10:39
Natural gas & LNG
Where everyone stands on Natural gas & LNG
Arshad Mansoor · Electric Power Research Institute (EPRI)
Germany permitted and built an LNG terminal in nine months when the energy crisis created urgency.
Mansoor argues that permitting speed depends on will. Germany's permitting for an LNG terminal had taken fifteen to twenty years, but after the Ukraine war created winter energy-security risk, it permitted and built a terminal in nine months. He uses this as evidence that the permitting constraint can be overcome when there is urgency.
“because of the Ukraine war they had a winter that they could have to turn the lights on... They built flat out in nine months a terminal to bring LNG. Permitted and built.”at 6:26
Nuclear energy
Where everyone stands on Nuclear energy
Arshad Mansoor · Electric Power Research Institute (EPRI)
EPRI is working with NYPA on plans for large AP1000 nuclear reactors in New York.
Mansoor says New York is now willing to consider nuclear power, and that EPRI is working with NYPA, the New York Power Authority, on building large AP1000 nuclear plants in the state. He presents this as part of the willingness to build that has emerged, which he expects to create many jobs.
“We're now working with NYPA, New York power... And we want to build large AP 1,000 nuclear power plants in New York. The rising tide will float everybody's boat, the amount of jobs that it will create.”at 6:48
Renewables & clean energy
Where everyone stands on Renewables & clean energy
Arshad Mansoor · Electric Power Research Institute (EPRI)
Grid batteries are short-duration sprinters that can't replace natural gas as the grid's backbone.
Mansoor says US natural gas storage can cover the country's gas needs for days, but the electricity stored in batteries can run the grid for only about thirty minutes. He calls today's batteries sprinters that will never run a marathon. He concludes that the grid will never run on batteries in place of natural gas.
“We'll have enough batteries for The US grid to run on batteries for maybe thirty minutes. So it's never going to be natural gas... today's batteries, they're sprinters... They will never run marathon.”at 9:49
Topics
- LNG terminal permitting
- data center buildout speed
- electricity bills & public trust
- electricity demand growth
- grid buildout constraints
- grid financing
- grid flexibility
- grid-scale batteries
- new reactor builds
- power for AI
- transmission permitting
More from J.P. Morgan Making Sense
- Healthcare’s next wave: AI, innovation and the future of access · November 20, 2026
- The rise of content as data: How AI is reshaping market insights · November 17, 2026
- Financing the Future of Defense: Admiral Pierre Vandier on Innovation and Investment · November 15, 2026
- Revving the ETF vehicle: Roundhill’s CEO on DRAM, next-gen innovation and more · November 13, 2026
- US midterms: Fiscal, market and geopolitical implications of the "blue wave" · November 9, 2026
Ask your AI about this episode
Chorus gives Claude, ChatGPT and other assistants every view from this episode and every other show Chorus follows. Ask who agrees, who changed their mind, and what else was said about the same companies.
Chorus reports what speakers said. It isn't investment advice. How Chorus works · About Chorus